The YORbuild Lot 1 project was to provide an “inside out classroom” at Quay Primary School in Bridlington. The work was carried out during the summer break and involved the provision of an all-weather outside classroom which was achieved by installing three bespoke tent-roofed “Cube Pods” on the school playground.

The aluminium pod structures have a suspended timber floor surrounded by polycarbonate and timber cladded walls with
direct access from one of the adjacent classrooms. Areas of non-slip timber decking were installed and other external works
included the replacement of the existing soft play surface, new circular log fencing, gates, a raised planting area around the
existing oak tree and a large sand pit area.

Project Information

Value

£63,200

Location

Bridlington

Duration

6 Weeks

Similar Projects:

Bishop Burton College Campus Redevelopment

Bishop Burton College Campus Redevelopment

There are 12 projects in these sectors see all

ISO 9001:2008 Quality Management Certification Safe Contractor Approved Member of Construction Line Investors In People Concom Contractor Competency The Contractors Health and Safety Assessment Scheme ISO 14001:2004 Environmental Management Systems OHSAS 18001:2007 Occupational Health and Safety Management System

© Geo Houlton & Sons Ltd. Registered in England 01632717

Sitemap

Privacy Policy

Disclaimer

Accessibility

Website by indicoll Ltd 2017