menu

Quality Construction Built on Tradition

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Pea Processing Plant

Birds Eye Peas

Pea Processing Plant

A transferred pea processing facility from their former factory on Hessle Road, in part, to enhance the current Norbert Dentressangle site in Hull to have the capability of processing peas at up to 61tonnes/hour, and over a standard pea season to produce 44,500 tonnes of frozen product.

Essentially a clad portal frame with a central concrete mezzanine to support the Cabinplant Integrated-Blancher-Coolers, 34m x 75m x 9.5m high with a pitched roof. All internal finishes are suitable for hygienic efficacy and vary dependant upon product risk and local environmental conditions.

Upgraded services were installed to match the total site requirement to meet the needs of additional process equipment and ancillary equipment.The existing Cabinplant lines, including a newly procured cleaning assembly were transferred to the new building and installed parallel to each other in a 3 x 16 tonne/hour format. This includes the reception hoppers and existing Frigoscandia freezers.

Project Information

Value

£8,500,000

Location

Hull

Duration

49 Weeks

Similar Projects:

Blast Resistant Office Building

Blast Resistant Office Building

There are 12 projects in these sectors see all

ISO 9001:2008 Quality Management Certification Safe Contractor Approved Member of Construction Line Investors In People Concom Contractor Competency The Contractors Health and Safety Assessment Scheme ISO 14001:2004 Environmental Management Systems OHSAS 18001:2007 Occupational Health and Safety Management System

© Geo Houlton & Sons Ltd. Registered in England 01632717

Sitemap

Privacy Policy

Disclaimer

Accessibility

Website by indicoll Ltd 2017