Houlton successfully won a £452,000 tender under the YORbuild framework to remove 600 metres of defective overhanging
concrete canopy roof slabs at Cottingham High School. The contract became urgent when a single 150kg slab made the headlines after it fell from a 3 storey building, thankfully when the school was closed.

This unique project required the use of 28 separate contract crane lifts ranging from 25t to 100t cranes and the actual removal of the slabs was assisted by specially designed and manufactured lifting frames fixed to the crane sling. Despite this, we were able to ensure that disruption to school lessons was minimised through weekly coordination meetings with the school’s Site Manager and the works were completed ahead of target in 16 weeks.

Project Information

Value

£452,000

Location

Cottingham

Duration

16 Weeks

Similar Projects:

Bishop Burton College Campus Redevelopment

Bishop Burton College Campus Redevelopment

There are 12 projects in these sectors see all

ISO 9001:2008 Quality Management Certification Safe Contractor Approved Member of Construction Line Investors In People Concom Contractor Competency The Contractors Health and Safety Assessment Scheme ISO 14001:2004 Environmental Management Systems OHSAS 18001:2007 Occupational Health and Safety Management System

© Geo Houlton & Sons Ltd. Registered in England 01632717

Sitemap

Privacy Policy

Disclaimer

Accessibility

Website by indicoll Ltd 2017