Houlton continued their relationship with Yorkshire Water at their Top Hill Low Site, by being awarded the refurbishment project of the maintenance building. The project , which included elements of design, was carried out over a 10 week period and managed on behalf of the client by Mason Clark.
The works included but, wasn't limited to the following:-
£212,158
Driffield
10 Weeks