Houlton Carry Out Refurbishment Works To Maintenance Building At Top Hill Low

Houlton continued their relationship with Yorkshire Water at their Top Hill Low Site, by being awarded the refurbishment project of the maintenance building. The project , which included elements of design, was carried out over a 10 week period and managed on behalf of the client by Mason Clark.

The works included but, wasn't limited to the following:-

  • Internal Timber Frame
  • Roof Refurbishment and Rainwater Goods
  • Structural Steel 
  • Drainage
  • Mechanical & Electrical
  • External Walls & Timber Cladding
  • Windows & External Doors
  • Internal Walls, Partitions & Doors
  • Floor  & Ceiling Finishes
  • Fittings & Furnishings
  • Decoration

 


Specifications

Cost £212,158
Location Driffield
Duration 10 Weeks
Client Yorkshire Water