Works comprise fire compartmentation works, roof repairs, conservation. Repair works to staircases, ceilings, and decorative plaster, decoration and specialist making good following Electrical works.

Electrical works comprise of trace heating, full rewire, new data points, mains distribution and lighting replacement works all of which will be carried out by the Employer's named subcontractor.

Beningbrough Hall is a Grade 1 Listed Building and as such we are Working alongside the Client appointed Conservator, carrying out inspection and protective works prior to work being carried out.

We are using our own in-house time served joiners to carry out opening up for inspections by the Conservator and Structural Engineer prior to any repair works/re-wiring being carried out.

Our joiners are also carrying out any required protective measures to floors and walls prior to scaffolding/crash-decks being installed for specialist ceiling repairs.

  • Close liaison with the National Trust & appointed Conservator
  • Sensitive temporary works designs for protection
  • Carful investigative works (utilising our time served joiners).
  • Conservation works
  • Stonework repairs
  • Lead repairs to the roof
  • Fire stopping
  • Management of Specialist Sub-Contractors

 

To meet the challenging timescales, it was important that planning and programming of the works were done well to ensure materials, sub-contractors and services are ordered in good time.  Where products and services are maybe not available, we would seek to look at alternative products or methods to achieve the required delivery timescale.

When developing the programme, we worked closely with the client to discuss key dates and milestones and if we can’t achieve certain targets, we looked at ways to accommodate the client’s requirements.

Extensive stonework repairs including:

  • Servants Staircase - existing Magnesian Limestone Steps with extensive previous sandstone indent repairs and open joints. Carefully removed previous sandstone indents to treads and replaced with Magnesian Limestone to match the existing.
  • Point up joints and cracks with lime mortar.
  • Extensive lead work repairs including:
  • Repairing splits/cracks in the roll ends.
  • All lead works require a Hot work permit and controlled monitoring including the use of a thermal imaging camera.

 

Extensive Brickwork repairs including:

  • Chimney repairs - extensive cracking and lean of stack.
  • Cutting and replacing of existing bricks, rebuilding the upper sections of chimneys. Helical bar stitching to every brick course.

Project Information

Value

£1,650,000

Location

York

Duration

32 Weeks